  • 手术室装修的动力及照明工程的事项
    来源:http://www.moptuan.com 浏览: 发布日期:2019-04-22
    手术是装修的注意事项中,我们都要用心去注意,其中动力及照明工程也非常重要的,下面我们就看看重症监护室装修时在动力及照明工程的注意事项!
    Surgery is the attention of decoration, we should all pay attention to it attentively. Power and lighting engineering are also very important. Now let's look at the attention of power and lighting engineering in the ICU decoration!!
    ① 洁净手术室和洁净辅助用房内必须设置的插座、开关、器械柜等均嵌入墙内,与墙面平齐。
    The sockets, switches and equipment cabinets that must be set in the clean operating room and the clean auxiliary room are embedded in the wall, which is level with the wall.
    ② 手术室和辅助用房内不得有明露管线。管线隐蔽工程在管线施工完成并进行试压验收后进行。管线穿墙、穿吊顶处的洞口周围用密封材料嵌缝修补平齐、严密并清洁。隐蔽工程的检修口周边应粘贴气密性密封垫。
    (2) There should be no exposed pipeline in the operating room and auxiliary room. Pipeline concealment works are carried out after completion of pipeline construction and acceptance of pressure test. Pipeline through the wall, through the ceiling around the hole with sealing materials to repair seams neat, tight and clean. Gastight gaskets should be pasted around the repair openings of concealed works.
    ③ 电线管的下料采用无齿锯,克服管口毛刺。管口设置护口。
    (3) Toothless saw is used to cut wires and pipes to overcome burrs at the orifice. The nozzle is provided with a guard.
    ④ 与土建密切配合做好预留工作。
    (4) Cooperate closely with civil engineering to make reservations.
    ⑤ 配电盘要求防尘,柜安装前要做卫生,安装后还要做卫生,并能使门关闭严密。安装插座、插座箱及线盒内必须打扫干净,紧贴墙面,安装端正。吸顶式灯具要紧贴吊顶,擦拭干净,所有进出管头都要采取密封措施。
    手术室装修
    Distribution panels require dust-proof, cabinets should be hygienic before installation, and after installation, they should also be hygienic, and the door can be closed tightly. Installation socket, socket box and wire box must be cleaned, close to the wall, correct installation. The ceiling-suction lamps should be close to the ceiling and wiped clean. Sealing measures should be taken for all inlet and outlet pipe heads.
    ⑥ 电缆敷设前必须核对设计无误,用500V摇表测量绝缘电阻,合格后方可放线,并逐一挂上写有电缆编号、规格、型号的标志牌。
    _Before laying the cable, the design must be checked correctly. The insulation resistance can be measured by 500V shaker. The cable can be laid before it is qualified. The cable number, specifications and models should be marked one by one.
    ⑦ 敷设的导线便于检查、更换。在穿线时将管内的杂物清除,除与设备连接处,管内不留接头。
    _The laid wires are convenient for inspection and replacement. During threading, the debris in the pipe is removed, and no joints are left in the pipe except for the connection with the equipment.
    本文精彩内容由重症监护室装修整理提供!希望通过小编的介绍对大家有所帮助,我们的官网是:http://www.moptuan.com多谢大家的阅读观看!
    The wonderful content of this article is provided by the renovation and arrangement of the intensive care unit. Hope to be helpful to you through the introduction of Xiaobian. Our official website is: http://www.moptuan.com. Thank you for reading and watching!