    一、施工前确认工程设计图纸和技术要求,并与各专业停止交流,讨论穿插作业时应该留意的成绩。
    1. Confirm the engineering design drawings and technical requirements before construction, and stop communicating with various specialties to discuss the achievements that should be paid attention to in the interpolation operation.
    工程施工中,由于未及时与电气专业沟通,招致插座开关与察看窗堆叠。
    In engineering construction, the socket switch and viewing window are stacked due to the lack of timely communication with the electrical profession.
    二、反省工程所用次要资料、设备能否合格,必要时要请业主参与反省。
    2. Reflect on whether the secondary information and equipment used in the project are qualified or not, and invite the owner to participate in the reflection when necessary.
    由于未对察看窗作反省任务,就装置察看窗,业主检查之后对察看窗质量不称心,招致察看窗改换偏重新装置。
    Since the inspection window is not a reflection task, the inspection window is installed. The owner is not satisfied with the quality of the inspection window after the inspection, which leads to the replacement of the inspection window and the re-installation.
    污染装修
    Pollution decoration
    三、施工进程中增强进度控制及质量控制。
    3. Enhance progress control and quality control in the construction process.
    四、干净室施工管理制度要严厉执行。
    4. The clean room construction management system should be strictly enforced.
    五、世纪星工程施工中,资料是先到顶板,后到墙板。但是,施工起头根本都是从立墙板开端,然后跟着吊顶板。所以,招致了施工资料需求和资料供应之间的矛盾。
    Fifth, in the construction of Century Star Project, the information is first to the roof, then to the wall. However, the construction starts from the vertical wallboard and then follows the ceiling. Therefore, the contradiction between the demand for construction materials and the supply of construction materials has arisen.
    手术室装修
    六、二、三楼有许多板材都是立到楼板大梁底部,由于搬运及吊顶上部布满管线管道,所以板材都切割运用。可以订吊顶高度的板材,然后各房间之间可以用铁皮封堵。
    On the sixth, second and third floors, many slabs are erected at the bottom of the floor girder. Because of the transportation and the overhanging of pipelines, the slabs are cut and used. The ceiling height can be ordered and then sealed with iron sheet between rooms.
    七、门洞预留的时分未思索直流平水泥及PVC地板的厚度,招致干净室钢质门装置后门底部与地坪摩擦。
    7. The thickness of DC flat cement and PVC floor is not considered when the door is reserved, which causes friction between the bottom of the back door and the floor of the clean room steel door device.
    八、风淋室装置当前风淋的风速较小,不能满足吹淋的要求。反省屡次后,是电机的相序接错,招致风机反转,风速过小。
    8. The current wind speed of the air shower chamber device is small, which can not meet the requirements of the air shower. After many introspections, it is the wrong phase sequence of the motor that causes the fan to reverse and the wind speed is too small.
    九、一楼板材先到货的爲一些依据图纸尺寸的非标板和规范板,剩余的很大一局部是要施工进程中测量尺寸加工的。由于非标板材尺寸与现场的差别及没有非标板材的衔接,招致板缝对齐重新调整及板材排布进程中短少资料,终招致施工停顿不分明。
    Ninth, the first floor of the first floor of the board first arrival is based on the size of some drawings of non-standard boards and specifications, the rest of a large part of the construction process is to measure the size of processing. Because of the difference between the dimension of non-standard plate and the site and the lack of connection of non-standard plate, the alignment of plate joints and the short information in the process of plate layout are caused, which eventually leads to the construction halt.
    综上所述有山东净之源净化工程有限公司提供,更多手术室装修知识,欢迎关注我们的网站:http://www.moptuan.com谢谢支持!
    To sum up, Shandong Jingzhiyuan Purification Engineering Co., Ltd. provides more knowledge of operating room decoration. Welcome to our website: http://www.moptuan.com. Thank you for your support!