上海11选5走势图

新闻资讯
  • news
  • 咨询热线:
  • 0531-87568508
  • 18653128690
  • 上海11选5走势图
  • 您现在的位置:上海11选5走势图 > 新闻资讯 > 上海11选5走势图 >
  • 手术室的装修结构标准
    来源:http://www.moptuan.com 浏览: 发布日期:2017-06-14
    根据手术室建设的成功范例及《医院洁净手术部建筑技术规范GB50333—2002》的要求一般综合医院每50张床位设置一间,一级手术室按总手术室间数的15%设定,至少要一间给予考虑。
    According to a successful example of the construction of "operation room and hospital clean operating department construction technical specification of GB50333 - 2002" requirements of the General Hospital of 50 beds per set a level according to the total number of operation room operation room between 15% set, at least to a given.
    新建手术区须严格按照三区二通道的原则布局(即手术区,辅助区,其它用房区,洁净走道和准洁净走道),术前术后人员及无菌物品从清洁走道通过,术后污物从污物通道通过,这样清污分离可使手术后的污物及时得到处置,合理安排人流和物流,方便医护人员的正常活动,这样才能提率有效防止交叉污染,从根本上减少污染的可能性。
    The new operation area shall be in strict accordance with the principles of the layout of the two channel three area (i。e。 operation area, auxiliary area, other rooms, clean walkways and quasi clean walkways), before and after the operation personnel and the sterile from the aisle by cleaning, after the dirt from the dirt through the channel, it can make the clean separation after surgery dirt get timely disposal, reasonable arrangement and convenient logistics flow, normal activities of medical personnel, so as to improve the efficiency and prevent cross contamination, the possibility of reducing pollution fundamentally。
    同时也使平面布局更趋合理,达到将建筑平面与净化空调系统有机地结合在一起,使它既满足净化技术要求又符合医院建筑设计和管理的要求,从而使得功能用房路线短捷,洁污分明、级别分区、防止交叉,减少术后感染,一般洁净手术部不宜设在一层和大楼顶层,应位于大楼群房上层为宜,手术部上层设设备层。
    At the same time to make the layout more reasonable, achieve the construction plane and purification air conditioning system organically combined together, so that it can meet the requirements and meet the purification technology of hospital building design and management requirements, so that the function of space line short, clean and clear, the level of division, to prevent cross infection, reduce the postoperative general clean operation Department is located in the floor and the top floor of the building, the building should be located in the upper room group is appropriate, the upper layer equipment operation department。
    本文由手术室装修进行编写,想要了解更多的产品及更详细的精彩内容,请关注我们的官方网站:山东净之源净化工程有限公司 http://www.moptuan.com。
    This article was prepared by the operation room decoration, want to know more products and more detailed wonderful content, please pay attention to our official website: Shandong net source purification Engineering Co., Ltd. http://www.moptuan.com.

    上一篇:第一页
    下一篇:手术室净化存在哪些重要的特点

    易玩棋牌app下载 上海11选5 福运彩票平台 上海11选5开奖结果 悠洋棋牌下载 上海11选5APP 上海11选5走势图 上海11选5 上海11选5走势图 上海11选5走势图